Solutions by Project Scale

From 10 Servers to 1000s, Built Around the Project.

No two infrastructure retirement projects require the same operating model. A 20-server project looks different than a multi-site enterprise program. We scale the operating model around the infrastructure, not the other way around.

Small

Medium

Large/ Enterprise

Typical Volume
1-100 Servers
100-1000 Servers
1000+
Project Model
Focused Deployment
Structured Project
Programmatic / Phased
Team Structure
Small Field Crew
PM + Specialized Crew
Dedicated PM + Scalable Teams
Execution
Single / Multi-Day
Days to Weeks
Phased / Ongoing
De-Racking
Yes
Yes
Yes
Serialized Asset Tracking
Available
Standard by Scope
Program-Level
Secure Logistics
Yes
Coordinated
Multi-Site / High Volume
Asset Valuation
Asset-Level
Configuration-Level
Portfolio-Level
Asset Recovery
Buyback / Offset
Buyback / Recovery
Buyback / Rev-Share / Hybrid
Reporting
Project Closeout
Serialized Reporting
Centralized Program Reporting
Project Management
Field Lead
Dedicated PM
Program / Multi-Site Management
What Changes With Scale?

More Servers Doesn't Just Mean More People.

As infrastructure volume increases, the project changes across several dimensions.

People

Field Crew → Specialized Team → Program Organization

Data Security

Device Processing → Serialized Workflow → High-Volume Controlled Processing

Logistics

Single Shipment → Coordinated Loads → Multi-Site Logistics

Project Management

Field Lead → Dedicated PM → Program Management

Reporting

Project Records → Serialized Reporting → Centralized Program Reporting

Asset Recovery

Individual Assets → Configuration-Level Valuation → Portfolio-Level Recovery Strategy

We scale the system, not the headcount.

Small Project: 1-100 Servers

Fast, Focused Decommissions for Enterprise Data Centers

Single-day to several-day deployment. Services can include:

  • De-racking

  • Asset identification

  • Drive-level tracking

  • Data sanitization

  • Packing

  • Transportation

  • Asset recovery

Mid-Size Project: 100-1000 Servers

Structured Execution for MSP Refreshes

Several days to multiple weeks depending on scope. Services can include:

  • Phased de-racking

  • Drive-level serialization

  • On-site data sanitization

  • Asset reconciliation

  • Secure packing

  • Coordinated transportation

  • Configuration-level valuation

  • Asset recovery

Enterprise Program: 1000+ Servers

Programmatic Execution for Complex, High-Volume Migrations

Phased deployment based on site, volume, security requirements, and customer timeline. Capabilities may include:

  • Multiple field crews

  • High-volume asset processing

  • Drive-level serialization

  • Parallel sanitization workflows

  • On-site destruction where required

  • Multi-site logistics

  • Centralized reporting

  • Configuration-level valuation

  • Ongoing asset recovery

Built for Enterprise Requirements

Enterprise decommissioning requires more than asset removal—it requires strict tracking and security protocols. We provide end-to-end field services backed by rigid compliance frameworks and transparent chain-of-custody tracking.

Servers Removed

45,000+

Drives Securely Wiped

2M+

Projects Completed

1,000+

Team Industry Experience

20+ Yrs
R2v3
ISO 9001
ISO 14001
ISO 45001
NIST 800-88

What Does Your Project Look Like?

Whether you're retiring a single rack or planning a phased enterprise infrastructure program, we'll build the execution model around your site, assets, security requirements, and timeline.

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.